External Floor across 9 Storeys

We were employed by PDR Construction on a labour only basis to lay 5235m² of concrete over 9 storeys with different amounts of concrete on each level.

Some levels required a powerfloat finish and others needed an easi float finish.

We installed both the concrete and the framework within the required time, to the satisfaction of our client.

Concrete Pour Size
5,235m2
Concrete Laid Per Day
200m2
Reportable Accidents
0
Client Rating
100 out of 100
Safety Rating
5 out of 5

“We employed CBS for our project to install concrete floors with a variety of finishes across 9 storeys”

0.

Reportable accidents

100%

Client satisfaction

5/5

Rating: Time efficiency, safety & cleanliness

100%

Project requirements met

Ask for a quote or request more info from our expert team

We work across large and small jobs for both for commercial or private clients, ask us a question and see how we can help.

call us on
0161 244 9764

email
info@cbsconcreting.co.uk