Ollerton Petrol Station
“CBS installed concrete for our petrol station at Ollerton with an excellent finish and completed the project in just 1 week “
100% accredited
CSCS Accredited installers also on NVQ Scheme
Satisfied Clients
Over 99% of our clients have rated our work 10 out of 10
0 Accidents
No reportable accidents in the last 5 years
Ollerton MRH Forecourt
Our team installed concrete at the MRH Petrol Station, Ollerton for our repeat client Premier Group Ltd.
We laid concrete in bays with permanent K-Form formwork and an External Yard brush finish.
We used the hand lay method and completed the project in 1 week.
- Concrete Pour Size
- 360 m2
- Tolerance Achieved
- SR3
- Concrete Laid Per Day
- 32 m3
“CBS installed concrete for our petrol station at Ollerton with an excellent finish and completed the project in just 1 week.”
Methods used
Almost every concrete project requires a steel lattice to be built in place prior to the pour in order to reinforce and increase the concrete strength.
The hand lay concreting method uses a metal tamp to spread the concrete evenly across a surface. This takes years of experience to do correctly.
Finishes and prep used
Concrete shuttering is used to keep the pour in place while it is in the process of drying. A barrier is built around an area to stop any concrete spreading to unwanted areas.
Brush Finish Concrete Floors are typically used as a wearing surface on external yards producing high slip resistance and better wearing properties.
Ask for a quote or request more info from our expert team
We work across large and small jobs for both for commercial or private clients, ask us a question and see how we can help.
call us on
0161 244 9764
email
info@cbsconcreting.co.uk