JLR Wolverhampton
“CBS carried out raised concrete slabs for JLR project at Wolverhampton with an area of 4,259 m² ahead of the programme.”
100% accredited
CSCS Accredited installers also on NVQ Scheme
Satisfied Clients
Over 99% of our clients have rated our work 10 out of 10
0 Accidents
No reportable accidents in the last 5 years
Jaguar Landrover, Wolverhampton
Our team installed raised concrete slabs for our repeat client Speller Metcalfe at JLR Wolverhampton.
We laid concrete slabs with a powerfloat finish and 2 layers of steel fabric.
Total job size 4,259 m².
- Concrete Pour Size
- 4,259 m2
- Tolerance Achieved
- SR3
- Concrete Laid Per Day
- 140 m³
“CBS carried out raised concrete slabs for JLR project at Wolverhampton with an area of 4,259 m² ahead of the programme.”
Methods used
The hand lay concreting method uses a metal tamp to spread the concrete evenly across a surface. This takes years of experience to do correctly.
Almost every concrete project requires a steel lattice to be built in place prior to the pour in order to reinforce and increase the concrete strength.
Finishes and Prep used
With the right combination of machine size, timing and operator experience, a concrete powerfloat finish is a great choice for a smooth surface.
Concrete shuttering is used to keep the pour in place while it is in the process of drying. A barrier is built around an area to stop any concrete spreading to unwanted areas.
Ask for a quote or request more info from our expert team
We work across large and small jobs for both for commercial or private clients, ask us a question and see how we can help.
call us on
0161 244 9764
email
info@cbsconcreting.co.uk