Didsbury High School
“CBS Concreting carried out concrete slabs on our metal decking frame for Didsbury High School”
100% accredited
CSCS Accredited installers also on NVQ Scheme
Satisfied Clients
Over 99% of our clients have rated our work 10 out of 10
0 Accidents
No reportable accidents in the last 5 years
Our team carried out another project for our repeat client SMD, Didsbury High School comprises a 4 story building on metal decking with a total area of 7,695m².
- Concrete Pour Size
- 7,695 m2
- Tolerance Achieved
- SR3
- Concrete Laid Per Day
- 98 m3
“CBS Concreting installed concrete slabs on our metal decking frame for Didsbury High School, a project with a total area of 7,695 m²“
Methods used
The hand lay concreting method uses a metal tamp to spread the concrete evenly across a surface. This takes years of experience to do correctly;
Almost every concrete project requires a steel lattice to be built in place prior to the pour in order to reinforce and increase the concrete strength.
Finishes and prep
The Skip Float Concreting finish is the most basic of finishes & is the starting point for all other finishes. It requires a highly experienced tradesman to run a skip float over the surface while wet to flatten & seal the concrete.
Ask for a quote or request more info from our expert team
We work across large and small jobs for both for commercial or private clients, ask us a question and see how we can help.
call us on
0161 244 9764
email
info@cbsconcreting.co.uk