Case Studies

At CBS we allow the success of our past projects to speak for us . . .

100% accredited

CSCS Accredited installers also on NVQ Scheme

100% snag free

Across all jobs & within 14 days of installation

0 Accidents

No reportable accidents in the last 5 years

Thurston Road, Lewisham

9 storeys requiring various different finishing methods.

Size: 5235m2

View Case Study

New HSS Depot, Trafford Park

Installation of external service yards with a brush finish.

Size: 8500m2

View Case Study

Salford University

Flooring for 5 different blocks with 9 floors.

Size: 32,000m2

View Case Study

Asda Store

Installation for sales floor & back of house with 2 finishes.

Size: 6000m2

View Case Study

TJ Morris

Warehouse floor laser screed laid to FM2 with brush finish

Size: 20,000m2

View Case Study

Speculative Warehouse Build

Interior laser lay to FM2 with Permaban Alfa Joints.

Size: 2,500m2

View Case Study

AC Steels New Warehouse

Warehouse floor laser screed laid and completed in 5 days

Size: 2,000m2

View Case Study

Unisurge Farboud

Interior laser screed lay for 2 sites, completed in 5 days.

Size: 5,000m2

View Case Study

Cardinal Maritime New Warehouse

Raised decking floor and Laser screed lay to FM2

Size: 7,600m2

View Case Study

Teeside Biomass Power Station

750mm thick concrete pour, hand Lay to tolerance SR3

Size: 6,000m2

View Case Study

South Tyne & Wear Waste PFI

Hand lay to FM2 with Power Float and Dry shake finish

Size: 7,000m2

View Case Study

Allied Bakeries

Hand Laid internal floors with dry shake topping finish

Size: 3,000m2

View Case Study

DP World Port

External yard concrete to SR3 tolerance with brush finish

Size: 28,000m2

View Case Study

New Cold Wakefield UK

External Yard laid to SR3 with Brush Finish

Size: 10,000m2

View Case Study

Downtown Machester

External yard two pump lay with brush finish

Size: 3,000m2

View Case Study

Larsen Trade Park

External Yard laid to SR2 with a brush finish

Size: 1,000m2

View Case Study

Esso Eastbridge Petrol Station

Hand laid to SR3 with formwork and a brush finish

Size: 250m2

View Case Study

Park Royal Petrol Station

Hand laid with permanent formwork and brush finish

Size: 500m2

View Case Study

Parkham Petrol Station

Hand laid with permanent formwork and brush finish

Size: 400m2

View Case Study

Tokheim Petrol Station

Brush finish and oil resistant joint sealant used

Size: 600m2

View Case Study